1. Which of the following application performs planning for constraints simultaneously in real-time, which helps the user
  understand the impact on each business process?
ERP     APS     PLM

2. Which of the following application does all distribution, material, and capacity planning in a single regeneration across sites, in parallel?
Infor SCM Planner     Infor SCM Scheduler     Infor Demand Planning     MRP

3. Which parameters will leave less opportunity for orders to be late?
Maximum Capacity     Maximum Inventory levels     Shorter cycle times and higher throughput

4. In Infor SCM Planner, Constrained ATP and CTP will prevent resources from being overcommitted at the point of:
Order acceptance     MRP Run     Production Scheduling

5. An ERP system lacks the ability to quickly calculate how a change in the customer's order date will impact the overall business functions
True     False

6. Optimal sequencing will reduce setup scrap. The "Use-up-optimization" tool will calculate the most cost-efficient point to introduce new product.
True     False

7. Constrained scheduling will understand perishability within and between activities. This intelligence will reduce:
Scrap and obsolescence     Throughput     Overtime     New Product Introductions

8. SCM Planner Requires integration with ERP and cannot be used standalone.
True     False

9. Which of the following optimization engines does SCM Planner use?
Batch vs. Dynamic (heuristics)     ILOG's optimization     Linear Programming    

10. Which of the below mentioned diagram provides you with the detailed information needed to identify the causes of an order's lateness.
The Supply Network Analysis.     Inventory Overview.     Plan Monitor.

11. In which of the applications below there is no consideration given to the interdependency of material and capacity availability?
SCM Planner     ERP     SCM Scheduler

12. Manufacturing planning Problem lies in the sequencing Process itself.
True     False

13. How many phases does the Leveling Engine of SCM Scheduler use?
5     2     4     3

14. Modeling in Scheduler consists of entering the _______________ data specific to your enterprise.
Static Data     Dynamic Data     MRP

15. In SCM Scheduler which modules are dedicated to Modeling?
Material Levels     Production     Process     Administration     All of the above

16. The Synchronized MRP Engine generates recommended manufacturing orders with or without firm allocations to meet the
needs of the shop floor.

True      False

17. Why would you not recommend using a Dynamic Buffer on a bottleneck machine?
You would create 'holes' in your schedule
An order is logged in ERP, shipment confirmation done in APS
To identify the current setup of the machine

18. What is the difference between firm and temporary allocations?
Temporary allocations can be deleted and Firm cannot.
Temporary allocations are used in Firm Schedule
New customer order Entry is Temporary allocation

19. In SCM Scheduler several Manufacturing Processes can be linked to the same item.
True     False    

20. SCM Scheduler uses the below date to generate the Schedule
The Requested Date     The Planned End Date     The Confirmed Date